') else writeln(''); writeln(''); close(); }}
 

Prophecy Commences Summer Exploration Program on its Titan Vanadium, Iron, Titanium Project, Ontario

Vancouver, British Columbia, June 28, 2010: Prophecy Resource Corp. ("Prophecy" or the "Company") (TSX-V:PCY, OTC: PRPCF, Frankfurt: 1P2) announced today it has commenced an exploration program on  its Titan Vanadium/Iron Project.  The program comprises 22 line kilometres of linecutting covering over 2.7 square km in 100 m intervals that will extend the current surveyed grid west and southwest of the Titan Ti-V-Fe deposit.  A ground magnetometer survey will be conducted over this extension to close off a mag anomaly associated with the existing deposit, and to test with broader extensions highlighted in a previous airborne survey.  

The grid will also provide control for a concurrent geological mapping program that will ascertain any trends and focus on determining the nature of a Pt-Pd horizon intersected in past drilling, and whether there are any expressions of this mineralization at surface. 

A total of 4,898 historic assay intervals were recorded from 38 core holes drilled by Randsburg on the property.  Drilling highlights reported by Randsburg included 142 meters of 0.27% Vanadium (0.48% Vanadium Pentoxide) from hole RA-5-21 and 174 meters of 0.26% Vanadium (0.46% Vanadium Pentoxide) from hole RA-5-10. The mineralization started from surface to an open vertical depth of 500 meters. The complete horizontal and vertical extent of the deposit is still to be determined.  Prophecy intends to drill Titan in 2010 to expand on the existing 48.9 million tonne inferred resource, and possibly discover other zones of exploration interest. 

Prophecy optioned 80% Titan from Randsburg International Gold Corp. (TSX-V: RGZ) – (see Prophecy news, January 14, 2010). Titan contains a National Instrument 43-101 compliant Inferred resource of 48.9 million tonnes, grading 48.1% iron (Fe2O3) 14.8% titanium (TiO2), and 0.23% vanadium (V).  The property is located approximately 120 km east-northeast of Sudbury, Ontario straddling the boundary between Angus and Flett Townships, with access to excellent infrastructure. The Titan property consists of 1,052 contiguous hectares (2,600 acres) comprising 17 patented claims and 3 mining claims.


Work program map superimposing the grid onto the airborne mag survey.
Click to enlarge

This news release has been reviewed and approved by Danniel J. Oosterman, PGeo, and a Qualified Person as defined in NI 43-101. For more information about Prophecy, please contact Paul McKenzie at +1.604.642.2625 ext. 107 or John Lee at +1.800.851.1528

About Prophecy Resource

Prophecy Resource Corporation is an internationally diversified company engaged in developing, energy, nickel and platinum group elements projects. The company controls over 1 billion tonnes of open-pittable thermal coal in Mongolia. In Canada Prophecy owns Lynn Lake Nickel Project, a 10% equity stake in Victory Nickel and agreed to merge with Northern Platinum (TSX-V: NTH) on June 15, 2010. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

ON BEHALF OF THE BOARD OF DIRECTORS Prophecy Resource Corp.
"JOHN LEE"
John Lee
Chairman
Telephone 1.800.851.1528
Email: [email protected]



Mineral resources that are not mineral reserves do not have demonstrated economic viability. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  


Mineral resources that are not mineral reserves do not have demonstrated economic viability. Neither the Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Toronto Stock Exchange) accepts responsibility for the adequacy or accuracy of this release.  

 Forward Looking Statements: This news release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, including, without limitation, statements potential mineralization, the estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. . Although Prophecy believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals in respect of the Transaction, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with operating in foreign jurisdictions, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly the actual events may differ materially from those projected in the forward-looking statements. For more information on Prophecy and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

"Neither the Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Toronto Stock Exchange) accepts responsibility for the adequacy or accuracy of this release."


This press release does not constitute an offer to sell or a solicitation to buy any of the securities in the United States.  The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (“the U.S. Securities Act”) or any state securities law and may not be offered or sold in the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

subscribe to us

Follow Prophecy Coal to get every newsreleases delivered to your Inbox

[-] Close

*Ulaan Ovoo: 174 million tonnes  of measured and 34 million tonnes of indicated coal. Ulaan Ovoo’s resource numbers are from the Behre Dolbear & Company (USA), Inc  report referenced in the Dec 2010, 43-101 Prefeasibility Study by Wardrop Engineering. Chandgana consists of two properties-Chandgana Tal and Chandgana Khavtgai. Chandgana Tal consists of 141 mt of measured resource. Chandgana Khavtgai consists of 509 mt measured and 539 mt indicated resource. Chandgana Khavtgai’s resource estimates are based on the September 2010 NI 43-101 Chandgana Khavtgai Technical Report by Kravits Geological Services, LLC. The report is authored by Christopher M. Kravits CPG, LPG of Kravits Geological Services, LLC., who was an independent Qualified Person under NI 43-101 at the time of report preparation. And the Chandgana Tal resource estimate is also based on the September 2007 NI 43-101 Chandgana Tal Technical Report by Behre Dolbear & Company (USA), Inc..The report is authored by Mr. Gardar G. Dahl, Jr., CPG of Behre Dolbear & Company (USA), Inc., who is an independent Qualified Person under NI 43-101.